Single-Minute Exchange of Die ยท changeovers in under 10 minutes
What SMED is
SMED (Single-Minute Exchange of Die) is a way to cut the cost and waste of changing over and retooling equipment. The goal: a changeover in under 10 minutes (single-digit minutes).
The key principle โ separate internal and external tasks
๐ด
INTERNAL tasks
Can be done only while the equipment is stopped
MACHINE OFF!
๐ข
EXTERNAL tasks
Can be done before or after the equipment stops
While the machine runs โ
The key to SMED: move as many tasks as possible from โinternalโ to โexternalโ โ do the preparation WHILE the machine is still running. That is where the main gain comes from.
6 steps of a SMED analysis
1
Analyze and video the current process
Film the ENTIRE changeover as it is. No video, nothing to analyze
2
Time every task
The time of every operator action. Where does most of the time go? Where is the downtime? Where is the waiting?
3
Split tasks into internal and external
Classify every task: can it be done BEFORE or AFTER the stop?
4
Convert internal tasks to external โญ
The key step! What prep can be done in advance? Tools? Materials? Settings?
5
Streamline and run in parallel
Which tasks can be done at the same time? Where do you need 2 operators instead of one?
6
Train the staff and roll out the standard
An SOP for the new process. Operator training. Measure the time afterward. Kaizen star
Formula 1 โ the best SMED example in the world
โThe best example of SMED is an F1 pit stop. Four tires changed in about 2 seconds โ SMED in action!โ
EXTERNAL TASKS
Getting ready for the stop
Tools ready, crew in position, tires warmed โ ALL BEFORE the car stops
PARALLEL WORK
20+ mechanics at once
Everyone knows their role. Four wheels โ four crews. At the same time, not one after another
STANDARDIZATION
An SOP for everyone
Every mechanic knows exactly what to do and in how many seconds. No improvising
RESULT
About 2 seconds (Red Bull record)
In the 1950s a pit stop took 60+ seconds. SMED cut the time roughly 30-fold
Illustrative case: preparing in advance (before/after)
BEFORE SMED
โThe operator waits for the machine to stop
โGoes off to find tools and molds
โPrepares the die set and pallet jack during downtime
โThe equipment sits idle for 40 minutes
AFTER SMED
โThe operator arrives before the stop
โMolds and die set are ready IN ADVANCE
โPallet jack and wrenches are in place before the stop
โDowntime cut to 15 minutes
Result: changeover time cut by โ62%. No new equipment โ just better organization.
Shigeo Shingo โ the man who turned changeover into an art
1
1950s
Mazda and Shingoโs first insight
Shigeo Shingo, a consultant engineer associated with the Toyota Production System, watched a changeover at a Mazda plant: retooling a large stamping press took hours. Managers thought this was a โnaturalโ limit โ a big machine needs time. Shingo set out to prove them wrong.
2
1969
Toyota: hours โ minutes
At a Toyota plant, Shingo applied his method: he separated the tasks that could be done BEFORE the stop (external) from those that required a stop (internal). Within a few months, the changeover of a 1,000-ton press dropped from about 4 hours to 3 minutes. The plant manager couldnโt believe his eyes. SMED was born.
3
1985
The SMED book โ a revolution in manufacturing
Shingoโs โA Revolution in Manufacturing: The SMED Systemโ reaches Western readers and is translated into many languages. The West is stunned: manufacturers report changeover reductions of 50โ90% without capital investment. SMED becomes a core part of Lean manufacturing.
4
Today
From F1 to pharma โ SMED is everywhere
Formula 1 โ a pit stop in about 2 seconds instead of 60. Pharmaceutical plants โ line changeovers cut from a full shift to under an hour. Fast-food chains โ switching from the breakfast to the lunch menu in minutes. The principle is the same: prepare in advance everything that can be prepared in advance.
The SMED paradox: most companies believe that shorter changeovers require expensive equipment. Shingo proved that most of the gain comes from organization, not investment.
๐ฏ Game โ Classify the tasks: internal or external?
Changeover on a forming line (mold change). Tap a task โ choose its type. External โ while the machine runs | Internal โ only when itโs stopped
CHANGEOVER TASKS:
๐ง Remove the old mold from the machine
๐ฆ Bring the new mold to the line
โ๏ธ Install the new mold
๐ฌ Inspect and prepare the new mold
๐๏ธ Gather the wrenches and tools needed
๐๏ธ Set the parameters on the panel
๐งน Clear leftover product from the line
๐ Fill in the changeover form
๐ด INTERNAL only when stopped
๐ข EXTERNAL before or after the stop
๐งฎ SMED impact calculator
Enter changeover data before and after SMED to see the financial and production impact (illustrative figures)